To enter through: State services
ENG The version for visually impaired
Official portal
Governments of the Rostov region
Websites of authorities
Main Activity Results and reports About results of preparation of housing stock, objects of engineering and social infrastructure of the Rostov region to operation during the autumn and winter period of 2020 - 2021

About results of preparation of housing stock, objects of engineering and social infrastructure of the Rostov region to operation during the autumn and winter period of 2020 - 2021

Information to a meeting of the Government of the Rostov region 25.11.2020.

 

For uninterrupted providing the heating period of 2020 - 2021 in the territory of the Rostov region and high-quality providing utilities to the population by the Ministry of Housing and Public Utilities of the Rostov region (further – the ministry) monitoring of preparation and passing of the heating period of 2020 - 2021 was carried out.

Preparation for the heating period  of 2020 - 2021 in municipal units of the Rostov region was carried out according to the approved scheduled plans, the minutes of the Government of the Rostov region of 29.04.2020 No. 18 "About results of operation of housing stock, objects of engineering and social infrastructure of the Rostov region during the autumn and winter period of 2019 - 2020 and tasks of preparation for the heating period of 2020 - 2021" (further – the protocol).

According to the protocol the ministry provided control of the course of performance of actions for preparation of objects of housing stock and engineering infrastructure of the Rostov region to operation during the autumn and winter period of 2020 - 2021, is organized and work on lighting in mass media of the course of preparation and passing of the heating period of 2020 - 2021 is carried out by objects of housing stock and engineering infrastructure of the Rostov region. Municipal units of the Rostov region provided creation of standard fuel reserves and monthly granting in the industry ministries of the Rostov region to information on the course of performance of actions for preparation of objects of the social sphere by the heating period of 2020 - 2021.

In the territory of the Rostov region the heating period is begun from 29.09.2020. All municipal units of the Rostov region adopted regulations about the beginning of the heating period of 2020 − 2021. The problematic issues revealed in the course of start of heat, were eliminated as soon as possible.

In municipal units of the Rostov region the volume of the prepared coal was 30.1 thousand tons, liquid fuel – 2.5 thousand tons that exceeds standard 45 and 30 daily requirements.

Utility companies of the Rostov region for 100% are provided with a reserve reserve of materials (pipes steel and polyethylene, latches and locks steel and pig-iron) for expeditious elimination of emergencies in spheres of heat and water supply.

At the ministry in the round-the-clock mode the dispatching service which accepts addresses of citizens on problems of start-up of heat works. The ministry will organize rapid response to each address of citizens.

According to requirements of the Order of the Ministry of Energy of the Russian Federation of 12.03.2013 No. 103 "About the Approval of Rules of Assessment of Readiness for the Heating Period" the North Caucasian management of Federal Service for Environmental, Technological and Nuclear Supervision created the interdepartmental commission on check of readiness of municipal units of the Rostov region by the heating period (further – the commission) at which meetings (all 7 are planned) questions of readiness for the heating period  of 2020 - 2021 of 55 municipal units of the Rostov region will be considered. Following the results of meetings of the commission decisions on issue to municipal units of the Rostov region of passports of readiness for the heating period will be made.

Municipal units of the Rostov region settled questions of repayment of debt of the resource supplying organizations in housing sector for gas and the electric power.

Thus, housing stock, objects of engineering and social infrastructure of the Rostov region are ready to passing of the heating period of 2020 - 2021. The ministry will continue monitoring of passing of the heating period of 2020 - 2021 before its end.

Realization of the tasks stated in the list of instructions and the recommendations of the Government of the Rostov region will not demand allocation of additional budgetary appropriations.

Additional files

loaded: On Nov. 19, 2020 14:01
Explanatory information
56 KB
loaded: On Nov. 19, 2020 14:01
List of instructions and recommendations
47.5 KB
Placed: On Nov. 19, 2020 13:46
Number of viewings: 135